Customization: | Available |
---|---|
Certification: | ISO9001:2008 |
Condition: | New |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Hydraulic mobile folding arm mini truck mounted crane
mini truck mounted crane
Product Type | DF-20 |
Chassis length(mm) | 3700-3900 |
Track width(mm) | 450-600 |
Overall height(M) | 2.9 |
Machine weight(t) | 15-19 |
Maximum drilling depth(M) | 20 |
Drilling diameter(mm) | 500-1500 |
Drill mast | ±5 |
Pitch angle | 4 |
Maximum travel speed of chassis(KM/h) | 2 |
Maximum creep degree of chassis | 30 |
Working state width(mm) | 2400 |
Transport status width(mm) | 2900 |
Transport status height(mm) | 3200 |
Drill type | Square bar pressure |
Whether the drill pipe can be customized | YES |
Whether to provide custom | YES |
Shandong DingLi construction Machinery Co., Ltd. is located in the south of Shandong Province, Mozi hometown - Tengzhou. Companies specializing in the production of crawler rotary drilling rig, wheeled rotary drilling rig and diesel hammer, photovoltaic piling machines and other construction machinery.
Maintenance:
1. Check whether the oil quantity is sufficient, make sure the oil quality is normal.
2. Check whether the gear oil of each reducer is sufficient, make sure the oil quality is normal.
3. Check whether there is oil leakage phenomenon, tighten the loose hose.
4. Check whether the lifting device is flexible and whether the internal butter is contaminated.
5. Check whether there are cracks, rust, out of soldering and other damage in the frame structure, tighten bolts.
6. Check the electrical wire, sensor, operation button handle and other working conditions.
7. Check whether the main and auxiliary wire rope has broken, and its connection is safe and reliable, and whether the strength of pressure rope equipment is sufficient.
8. Whether all transmission parts are fastened.
9. The engine hydraulic system will preheat for 5-20 minutes in advance, according to different climate, and check whether the instrument is normal.
10. After 100 hours of the first time work, release the Hydraulic Oil, and oil of the radiator, clean and replace the damaged filter, use 3.5 litres of diesel. Inject 160 litres of special hydraulic oil, after clean the tank (Requirements: Oil level must not less than 80% of the level gauge of the fuel tank, when stop the machine.)
Q1: Are you a manufacturer?
A: Yes, our company was established in 1995. We are a professional Rotary Drilling Rig Manufacturer and have many years of technological exchange with Xozhou Heavy Industry Group.
Q2: What does your company produce?
A: The main products of our company include Ground Hole Drilling Machine, Crawler Rotary Drilling Rig, Wheeled Rotary Drilling Rig and Diesel Hammer, Photovoltaic Piling Machines and other Construction Machinery, etc.
Q3: How about your delivery time?
A: Normally the delivery time is about 7-15 days. For some special case, we can make it within 2 weeks, which depends on different products.
Q4: What methods of payment do you accept?
A: We accept T/T, L/C, D/P, D/A, etc. Of course we can have a discussion for this.