Customization: | Available |
---|---|
After-sales Service: | Video Support |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
2018 Pile Hole Drilling Head Tools Rig
Product Type | DS-20 |
Chassis Length(mm) | 4000 |
Track Width(mm) | 600 |
Overall Height(M) | 3.2 |
Machine Weight(t) | 19-21 |
Max Drilling Depth(M) | 20 |
Drilling Diameter(mm) | 500-1800 |
Engine Brand | YUCHAI/WEICHAI/ Cummins(Optional) |
Rated Motor Power(KW) | 126-151 |
Max Torque of Power Head( N.m) | 40000-80000(Optional) |
Rotating Speed of Power Head(rpm) | 10-60 |
Max Main Pump Pressure of Hydraulic System(MPa) | 30 |
Max Auxiliary Pump Pressure of Hydraulic System(MPa) | 12 |
Max Flow Rate of Main Pump Hydraulic System( L/min) | 63*2-128*2( Optional ) |
Max Flow Rate of Auxiliary Pump Hydraulic System( L/min) | 16 |
Max Pressure of Pressurization System(KN) | 100 |
Max Lifting Force of Pressurization System(KN) | 100 |
Max Stroke of Pressurization System(mm) | 3000 |
Max Lifting Force of Main Winch(KN) | 100 |
Max Lifting Speed of Main Winch(m/min) | 50 |
Max Lifting Force of Auxiliary Winch(KN) | 15 |
Max Lifting Speed of Auxiliary Winch(m/min) | 50 |
Max Lifting Capacity of Auxiliary Winch(t) | 1.5 |
Angle of (Left; Right) Inclination of Drill Mast(.) | +5 |
(Front) Pitch Angle of Drill Mast (.) | 4 |
Max Travel Speed of Chassis(km/h) | 4 |
Max Climbing Degree of Chassis(.) | 30 |
Maximum Travel Torque(N.m) | 25000-33000 |
Working Status Width(mm) | 2400 |
Transport Status Width(mm) | 2400 |
Transport Status Height(mm) | 3300 |
Type of Drill Pipe | Machine lock lever |
Drilling Tool | Optional 500-1800 Drill Head, Core, etc. |
Customized | Yes |
2018 Pile Hole Drilling Head Tools Rig
1. Rotary Excavator is a kind of integrated Drilling Machine, which can be used in many kinds of bottom layer, having the characteristics of high speed of hole-forming, low pollution and strong maneuverability.
2. A short spiral drill can be used for dry digging, and a rotary drill can be used for wet digging. Equipped with punching hammer, the rotary excavator can be used to drill through the hard strata.
3. It can be expanded at the bottom of the hole, If the drilling tool is used. The rotary excavator adopts multi-layer telescopic drill pipe, which has less support time and low labor intensity.
4. Do not require mud circulating slag and cost saving, which is especially suitable for the construction of urban construction.
5. Hydraulic Oil models are selected according to local climate: 34#, 46# and 68#.
6. After the first time receiving of Rotary Drilling Rig, release diesel and clean the fuel tank. According to the climate, the diesel is added for the same model: -40#, -30#, -20#, -10# and 0#.
7. After 100 hours of all engines work, release and replace engine oil.
8. After 100 hours of all engines work, release and replace the coolant of the water tank.
9. Cummins engine, please timely contact the local service station for the record, so as to maintain it in future. Otherwise all consequences will be at your own peril, when out of warranty time.
2018 Pile Hole Drilling Head Tools Rig
When digging a hole, the drill bit revolves around the vertical axis and makes the axial movement. Soil under the torque and axial force of drill bit will be cutting. During the process of working, under the action of centrifugal force and extrusion of the blade, soil are destroyed and brroke up. The formation of soil flows pressure to the pit wall, at the same time along the surface up to ground. When the soil flow moves to the place, where is no barrier of pit wall, the whole excavation process is completed due to the centrifugal force of the broken earth being thrown around the pit.
Refers to the sense of teamwork cooperation, team members' performance is one of the characteristics for collaboration, the interdependence between team members, mutual respect, tolerance and respect for individual differences, a relationship of trust between each other, treat people sincerely, respect the promise, help each other and improve together; Share interests and achievements and share responsibility. The sense of cooperation should be cultivated in the process of working, and the person in charge of the team should first be the family in mind.
Shandong Dingli Construction Machinery Co., Ltd. is located in Tengzhou, the south of Shandong Province, where is the hometown of Mo-tse. We specialize in the products of Crawler Rotary Drilling Rig, Wheeled Rotary Drilling Rig and Diesel Hammer, Photovoltaic Piling Machine and other Construction Machinery. After our success in domestic market, we are ready to introduce our products to oversea market. With our rich experience and professional knowledge, we hope to bring our best service and products to oversea clients.
Our Certification:
Maintenance
1. Check whether the oil quantity is sufficient, make sure the oil quality is normal.
2. Check whether the gear oil of each reducer is sufficient, make sure the oil quality is normal.
3. Check whether there is oil leakage phenomenon, tighten the loose hose.
4. Check whether the lifting device is flexible and whether the internal butter is contaminated.
5. Check whether there are cracks, rust, out of soldering and other damage in the frame structure, tighten bolts.
6. Check the electrical wire, sensor, operation button handle and other working conditions.
7. Check whether the main and auxiliary wire rope has broken, and its connection is safe and reliable, and whether the strength of pressure rope equipment is sufficient.
8. Whether all transmission parts are fastened.
9. The engine hydraulic system will preheat for 5-20 minutes in advance, according to different climate, and check whether the instrument is normal.
10. After 100 hours of the first time work, release the Hydraulic Oil, and oil of the radiator, clean and replace the damaged filter, use 3.5 litres of diesel. Inject 160 litres of special hydraulic oil, after clean the tank (Requirements: Oil level must not less than 80% of the level gauge of the fuel tank, when stop the machine.)
2018 Pile Hole Drilling Head Tools Rig
Shandong Dingli Construction Machinery Co., Ltd. has more than 20 years of experience in mechanical production line, the company and scientific research, production, sales and after-sales as one of the large-scale comprehensive enterprise,we always adhere to the company's "Three For" spirit, "For community", "For customers" and "For responsibility". We provide you 24 hours of hotline for after-sales service, so that the majority of users can create greater value.
2018 Pile Hole Drilling Head Tools Rig
We have technical engineers, who are qualified to solve the problems that you suffered from our machines. As an experienced manufacturer, we have many sponsors in different areas from our country, we also have enough spare parts in our stock for clients immediately delivery.
Q1: Are you a manufacturer?
A: Yes, our company was established in 1995. We are a professional Rotary Drilling Rig Manufacturer and have many years of technological exchange with Xozhou Heavy Industry Group.
Q2: What does your company produce?
A: The main products of our company include Ground Hole Drilling Machine, Crawler Rotary Drilling Rig, Wheeled Rotary Drilling Rig and Diesel Hammer, Photovoltaic Piling Machines and other Construction Machinery, etc.
Q3: How about your delivery time?
A: Normally the delivery time is about 7-15 days. For some special case, we can make it within 2 weeks, which depends on different products.
Q4: What methods of payment do you accept?
A: We accept T/T, L/C, D/P, D/A, etc. Of course we can have a discussion for this.