Factory Supply Crawler Track-Mouted Hydraulic Rotary Drilling Rig for Building Engineering Construction

Product Details
Customization: Available
After-sales Service: Video
Warranty: 1 Year
Still deciding? Get samples of US$ 65000/Piece
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2018

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001, ISO 9000, ISO 20000, OHSAS/ OHSMS 18001, GMP, GAP, FSC
  • Factory Supply Crawler Track-Mouted Hydraulic Rotary Drilling Rig for Building Engineering Construction
  • Factory Supply Crawler Track-Mouted Hydraulic Rotary Drilling Rig for Building Engineering Construction
  • Factory Supply Crawler Track-Mouted Hydraulic Rotary Drilling Rig for Building Engineering Construction
  • Factory Supply Crawler Track-Mouted Hydraulic Rotary Drilling Rig for Building Engineering Construction
  • Factory Supply Crawler Track-Mouted Hydraulic Rotary Drilling Rig for Building Engineering Construction
  • Factory Supply Crawler Track-Mouted Hydraulic Rotary Drilling Rig for Building Engineering Construction
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Certifications
  • EXHIBITION
  • Packaging & Shipping
  • Company Profile
  • Hot sale product
  • FAQ
Overview

Basic Info.

Model NO.
DR-130
Condition
New
Drill Hole Diameter
>300mm
Drill Hole Depth
10-30m
Bit Type
Drag Bit
Drilling Way
Rotary
Type
Crawler
Usage
Pile Driver, Drill Hole Flling Pile Construction
Chassis Length
4200mm
Drilling Diameter
500-1800mm
Drilling Depth
30m
Engine Power
205HP
Weight
28t
Transport Status Width
2800mm
Transport Status Height
3400mm
Power Head Speed
10-50rpm
Power Source
Diesel
Specifications
Crawler Drilling Rig
Application
New Machine
Drill Tools
Two Drill Bit
Engine
Cummin*S
Color
Customized
Transport Package
Rotary Drilling Rig Package According to The Custo
Specification
11500mm*2800mm*3400mm
Trademark
Yahe Construction Machinery
Origin
China
HS Code
8430509000
Production Capacity
20 Sets/Month

Packaging & Delivery

Package Size
1150.00cm * 280.00cm * 340.00cm
Package Gross Weight
28000.000kg
Lead Time
20 days (1 - 1 Pieces)
To be negotiated ( > 1 Pieces)

Product Description

Factory Supply Crawler Track-mouted Hydraulic Rotary Drilling Rig for Building Engineering Construction
Product Description
Factory Supply Crawler Track-Mouted Hydraulic Rotary Drilling Rig for Building Engineering Construction
1.DR-130 Drilling rig has a rated power of 151-176 kilowatts, a power output torque of 130kN·m, a maximum hole diameter of 1.8m, and a maximum hole depth of 30m, which can meet the requirements of various large-scale foundation constructions.

2.The maximum drilling depth is 30 meters, the drilling diameter is 500-1600MM, the chassis is telescopic, and the mast can be adjusted vertically.

3.The mast is also equipped with an auxiliary winch, which can assist in hoisting the required objects.

4.The upper body has an automatic reset function. It is convenient for the drill rod to be aligned with the drilling hole, and the work efficiency is improved.
Product Parameters
Product Type DR-130
Chassis length.(mm) 4200
Track width.(mm) 600
Machine weight.(t) 28
Maximum drilling depth.(m) 30
drilling diameter.(mm) 500-1600
Engine brand Cummin*s
Engine rated power 205hp
Maximum torque ofpower head.(KN.m) 130
Power head speed.(rpm) 10-50
Maximum working pressure of hydraulic system main pump.(MPa) 30
Maximum working pressure of hydraulic system auxiliary pump.(MPa) 12
Maximum bow rate ofthe main pump hydraulic system.(L/min) 80*2(Optional)
Maximum bow rate ofthe auxiliary pump hydraulic system.(L/min) 16
Maximum pressure ofthe pressurization system.(KN) 100
Maximum lifting force ofthe pressurization system.(KN) 80
Maximum travel pressure system.(mm) 3000
Maximum lifting force ofthe main winch.(KN) 150
Maximum pull-up speed ofthe main winch. (m/min) 50
Maximum lifting force ofthe auxiliary winch.(KN) 15
Maximum pull-up speed ofthe auxiliary winch.(m/min) 50
Left and right inclination angle of drilling mast(°) ±5
Forward and backward inclination angle ofthe drilling mast. (°) 5/90
Maximum driving speed(KM/h) 1.5
Maximum climbing angle.(°) 25
Maximum Driving torque.(KN.m) 40000-45000
Overall width of working state.(mm) 2800
Overall length oftransport status.(mm) 11500
Overall width of transport status.(mm) 2800
Overall height of transport status.(mm) 3400
 
Machine Photos                                          
Factory Supply Crawler Track-Mouted Hydraulic Rotary Drilling Rig for Building Engineering Construction
Factory Supply Crawler Track-Mouted Hydraulic Rotary Drilling Rig for Building Engineering Construction
Factory Supply Crawler Track-Mouted Hydraulic Rotary Drilling Rig for Building Engineering Construction
Factory Supply Crawler Track-Mouted Hydraulic Rotary Drilling Rig for Building Engineering Construction
Factory Supply Crawler Track-Mouted Hydraulic Rotary Drilling Rig for Building Engineering Construction
Factory Supply Crawler Track-Mouted Hydraulic Rotary Drilling Rig for Building Engineering Construction
Certifications
We have many certificates, support verification, we export more than 30 countries!
Factory Supply Crawler Track-Mouted Hydraulic Rotary Drilling Rig for Building Engineering Construction
EXHIBITION
We have been committed to participate in a variety of offline exhibitions, not only for the sale of our rig, but also for continuous learning. We are committed to the world, launched "rotary drilling rig, made in China!"
Factory Supply Crawler Track-Mouted Hydraulic Rotary Drilling Rig for Building Engineering Construction
Factory Supply Crawler Track-Mouted Hydraulic Rotary Drilling Rig for Building Engineering Construction
Packaging & Shipping
At present, there are three ways to transport rotary drilling rig: special equipment frame box, RO ro ship and bulk carrier. Generally speaking, they are the first two. Although the price is a little expensive, compared with bulk carriers, they are very safe. We will arrange port personnel to take reinforcement photos in each link. If customers need, we can send them by email.
Factory Supply Crawler Track-Mouted Hydraulic Rotary Drilling Rig for Building Engineering Construction
Company Profile

 

Shandong Yahe Construction Machinery has been at the forefront of developing and enhancing rotary drilling rigs for numerous years, proudly holding the CE certification from the European Union. Our rigs are extensively utilized in a myriad of construction projects including urbanization, metro systems, viaducts, high-rise buildings, and residential complexes. Renowned for their exceptional construction efficiency, energy conservation, eco-friendly operations, and unwavering reliability, our rotary drilling rigs have garnered accolades from clients worldwide. Our equipment has successfully been exported to over 10 countries and regions, including Australia, Saudi Arabia, Myanmar, Bangladesh, and Sudan. It stands as the premier choice for pile foundation solutions in global engineering and the advancement of new urbanization.
Factory Supply Crawler Track-Mouted Hydraulic Rotary Drilling Rig for Building Engineering Construction

Hot sale product
Factory Supply Crawler Track-Mouted Hydraulic Rotary Drilling Rig for Building Engineering Construction
Factory Supply Crawler Track-Mouted Hydraulic Rotary Drilling Rig for Building Engineering Construction
Factory Supply Crawler Track-Mouted Hydraulic Rotary Drilling Rig for Building Engineering Construction
Factory Supply Crawler Track-Mouted Hydraulic Rotary Drilling Rig for Building Engineering Construction
Factory Supply Crawler Track-Mouted Hydraulic Rotary Drilling Rig for Building Engineering Construction
Factory Supply Crawler Track-Mouted Hydraulic Rotary Drilling Rig for Building Engineering Construction

 

FAQ
1.Q: Are you a manufacturer?
 
 A: Yes, we are a professional rotary drilling rig  manufacturer.
 
2.Q: What does your company produce?
 
 A: The main products of our company include rotary drilling rig.
 
3.Q: How about your delivery time?
 
 A: Normally the delivery time is about 35 days after receipt of deposit. For some specialcase, we can make it within 20days, it depends on different products.
4.Q: What methods of payment do you accept?
 
A: We accept T/T, L/C.
 
5.Q: Do you offer any deals or discounts?
 
 A: Yes, price depends on different quantity, different quantity will give you different price
 
CONTACT US NOW
YOU WILL GET A FREE TURN-KEY TOTAL SOLUTION
We'll get back to you within the day.
Welcome to visit our factory!

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier