Customization: | Available |
---|---|
Certification: | Ce/ISO9001, 1 Year |
Condition: | New |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Construction machinery low price customized 6 Ton truck mounted crane
peration Instructions for the crane truck
1. Attention should be paid not to work under the maximum load of a small crane, but to use it within the capacity of a small crane. The small crane must be properly handled, that is, regular maintenance and repair of the small crane in accordance with the maintenance procedures
2, for small cranes, the existing maintenance technology and repair specifications are many small crane manufacturers and technical personnel for many years of practical experience summed up, this is scientific and reasonable basis.
3. Note the minimum starting speed of a small crane at a temperature to indicate the starting performance at this temperature and to indicate its low temperature starting performance with the minimum temperature that a small crane can start. The starting performance is closely related to the type of small crane, the design of the crane's combustion chamber and the crane's technological level.
4. The low temperature start-up of the small crane is mainly affected by the viscosity of the small crane lubricating oil, the evaporation of gasoline / diesel, the low temperature flow of the gasoline / diesel and the capacity of the crane battery.
5, in the appropriate environment suitable for small crane to carry out proper maintenance and operation, not illegal operation to prevent unnecessary trouble and casualties early.
There are two factors in the formation of leakage:
1., lax seal.
2. the oil viscosity is not qualified.
Sealed treatment is to replace seals or more replacement parts, variable amplitude, base reversal, due to poor sealing, large leakage, resulting in high oil temperature ratio, and advocate the main points of maintenance of these two directions.
The oil viscosity is not good, the new oil is changed.
3,There is also a physical way to cool down, that is, the installation of hydraulic oil radiator, after the fan blow dryer to reduce the temperature.
Q1: Are you a manufacturer?
A: Yes, our company was established in 1995. We are a professional Rotary Drilling Rig Manufacturer and have many years of technological exchange with Xozhou Heavy Industry Group.
Q2: What does your company produce?
A: The main products of our company include Ground Hole Drilling Machine, Crawler Rotary Drilling Rig, Wheeled Rotary Drilling Rig and Diesel Hammer, Photovoltaic Piling Machines and other Construction Machinery, etc.
Q3: How about your delivery time?
A: Normally the delivery time is about 7-15 days. For some special case, we can make it within 2 weeks, which depends on different products.
Q4: What methods of payment do you accept?
A: We accept T/T, L/C, D/P, D/A, etc. Of course we can have a discussion for this.